Loading tweets
My Original Websites Original Blogger Site (older entries) Original Website (older info)
Written by: 11/8/2008 6:58 AM
1. Install cockpit speakers
2. Get pactor modem and sailmail for ssb
3. Replace mizzen boom topping lift
4. Set Storm Try and run lines (purchase lines)
5. Inventory spare parts and organize
6. Netting on opening storage hatches
7. Lee cloth on sea birth
8. Build medical kit
9. Rebuild opening hatches
10. Test generator with cold plate system
11. Get food storage bottles (nalgene)
12. Get food grade tubing to replace on watermaker
13. Renew hoses in the hold
14. Run New wire for ssb from mizzen shroud to main backstay
15. Get pump rebuild kits
16. Get sail repair kit
17. Change boat Name
18. Trace Alternator/Tach Problem
19. Dremmel lip off the drop leaf bar
20. Get Windlass cover made
21. Install Exhaust Elbow and Prop Lock
22. Put new 100% on the furler
23. Design foux grass potty spot for dog
24. Replace flag halyards (starboard main & mizzen)
Lee Winters Skype: (281) 336-0855 Satellite Phone: 8816-316-59853 Email: Lee.Winters@SailingForSOS.com
0 comment(s) so far...