Loading tweets
My Original Websites Original Blogger Site (older entries) Original Website (older info)
Written by: 10/20/2008 4:49 PM
There are about two dozen projects not on this list, but these were the most critical at the start of last week. Not bad progress. Lots to go.
Cancel Slip – 30 Day Notice
Install flexible holding tank
Trace Alternator/Tach Problem
Change Engine impeller and spairs
Dremmel lip off the drop leaf bar
Oven security bar
Helm Mount the command mic (almost done)
Softwood plugs at through hulls
Pick up shackles for parell beads – Kemah Hardware?
Recaulk Chain Plates (stripping old caulk)
Rebed rusty stanchions
Plumb the water tank deck plate
Replace lazy jack boom cleat
Hang lifeline netting
Install Exhaust Elbow and Prop Lock (at fab)
Install new opening ports (on order)
Get Windlass cover made
Put new 100% on the furler (on order)
Install cockpit speakers (on order)
Design foux potty spot for dog (have grommet kit and turf)
Order/design Ditch Bag – Landfall Navigation.com
Change compression washer and lube furler
Grease winches
Fix plug and anchor chain holder for windlass
Get gas, water, and diesel cans x2 each
Lee Winters Skype: (281) 336-0855 Satellite Phone: 8816-316-59853 Email: Lee.Winters@SailingForSOS.com
0 comment(s) so far...