Loading tweets
My Original Websites Original Blogger Site (older entries) Original Website (older info)
Written by: 10/7/2008 7:02 PM
The work continues. The non-skid project is all but done. I ran out of Kiwi-grip with every section completed except for the floor of the cockpit. Overall I am very happy with the way it came out. No complaints. I spent some time today over at the pump out dock. I flushed and backfilled the holding tank seven times in anticipation of removing the old tank and all the old line. I also got a rebuild kit for the old Raritan PHII head and pump so I can renew everything before I go. I really don’t want to do this job, but I was once told that two systems eat up more cruisers time than any other, generators and heads. I should have both sorted before leaving. It’s hard to find a fair balance of time these days. I still have a responsibility to perform my duties for my company as long as I am drawing a check. On top of that I’ve been seeing someone for a few weeks and enjoy spending time with her. Everything takes time away from boat prep, but it is getting done. It kind of seems like the fevered pitch of the election is tied to the pitch of my preparations. I just got my new ships computer sorted with most of the software I’ll need for the trip. Next thing to do is test sending in blog updates from the SatPhone through the laptop. If this works I’ll do a little dance because I still don’t know how to use my HF Radio. Sorry for the lack of updates more to come. LW
0 comment(s) so far...